The new building of the fire station with area DRK and rescue station, an elongated, compact structure is oriented to the east towards the center and blends harmoniously into the surroundings. True to the motto - Show what you do - the future use occupies the functional and flexible building and shows itself with the vehicle hall side directly to the east as a transparent fire and rescue station.

Attention is paid to a safe traffic routing. The accesses are directly via Rheinhausenstrasse, the alarm exit via Westendstrasse.The visitor parking spaces are arranged separately from the alarm parking spaces. A complete bypass of the building is possible. The expression of the building is independent and appropriate for a fire station. There is no rear on the building. The independent function and division into 3 equal, albeit different sized areas of the building is clearly shown to the outside.
.

work phase 1-4, 2021-2023
competition: 1st prize
GFA: 3,600 m²
BRI: 18,000 m³
client: City of Herbolzheim
location: Herbolzheim
visualization: Steimle Architekten

fire station Herbolzheim